Hello PP gurus,
I'm trying to implement "Planning Time Fence" to be able to automatically "firm" planned orders falling within the time fence. I have gone into Material Master Record and used MRP Type P1 under MRP View 1 (see image below) to be able to use firming. However, when I use MD04 to look at Stock Requirements List for this item, I get/see the MRP type "PD" (see second image below). I assume that there is a link/table that connects MRP Type with either the MRP Area or at Plant Level and that link/table overrides what I entered in Material Master Record.