I am facing a strange situation as explained below:
I have variant configuration and change management for the BOMs is active. I have created one 'change master with release key' (CC01) and modified a material BOM (CS02) using it (added a component). The change number is still not released (Release Key is blank). But when I run CU51, the order BOM is picking up the changed material BOM (the added component is there in the created order BOM accessed through CS63).
How can I restrict the unreleased changes from being reflected in the order BOM?
Even when I try to create a BOM by copying, I am facing the same thing. The changes in the source BOM are being reflected.
Kindly throw some light on this.